Japan’s 548 MWh Tesla Megapack Plant Is Set to Start Up December 1
ORIX says its 134 MW, 548 MWh Maibara Koto battery plant in Japan will start commercial operations December 1. The project uses Tesla Megapacks.
ORIX says its 134 MW, 548 MWh Maibara Koto battery plant in Japan will start commercial operations December 1. The project uses Tesla Megapacks.
Tesla’s Phil Duan says work on FSD v15’s Reality View began just a few months ago, years after the idea first came up.
Tesla Powerwall 3P is now available to order in Switzerland, with three-phase home backup and Tesla Home energy management.
Tesla is considering a $3.1 billion USD polysilicon refinery in Texas, with 515 direct jobs planned and incentives still part of site selection.
Tesla says customer solar output now exceeds twice its annual operational electricity use, while keeping customer generation separate from its own energy goals.
Tesla says it is working with Nvidia on 800V data-centre power, with Powercore linking AI computing, Megapack batteries and solar.
Tesla’s Powercore combines a transformer, inverter and breaker, with 7.4 MW of continuous power and an operating target of 2027.
Software updates, deliveries, FSD rollouts. Five minutes. Free.
Tesla’s Megapack team is teasing a November 17 reveal at RE+, with an image promising “Transformation loading…” at booth N726.
Tesla is seeking changes to California’s proposed battery-storage disclosures and fire modelling rules. Here’s what the filing would change.
Tesla says real-time simulations helped validate 444 Megapacks at Melbourne’s 600 MW battery hub before it connected to the grid.
A new Crystal Sun drone video reports site preparation at Tesla’s proposed US$10.1B Texas solar factory site, drawing a brief response from Elon Musk.
Tesla Energy has expanded Powershare Home Backup to new Model 3 and Model Y vehicles with Powerwall 3, adding more than two days of home backup from the…
Tesla now lets Powerwall 2 owners add a Powerwall 3 to expand their home battery capacity in North America and Australia.
NVIDIA launched DSX Ready on September 21 to qualify power and cooling products for AI factories, naming Tesla Megapack among the first qualified battery energy storage solutions.
Sunrun and Tesla announced September 21 that their home battery fleets dispatched 580 MW to California's grid on September 9, the largest residential distributed power plant event on…